Sign In | Join Free | My chinaqualitycrafts.com |
|
Place of Origin : Shaanxi, China
Brand Name : AE
Price : Negotiation
Certification : CE;ISO9001;ISO14001;OHSAS 18001
MOQ : 1
Delivery Time : 30-90work days
Type : Hot Rolling Mill
Warranty of core components : 1 Year
Core Components : PLC, Bearing, Gear
Key Selling Points : Competitive Price
Hot Rolling Mill
Hot Rolling Mill 50000KG 10mm Continuous Automatic Steel Rebar Production Line Flat Bar Hot Rolling Mill Machine for Rebar Steel Making
1. 1-5t/hour steel bar production line, final bar size range is 8-32 mm,most use for build for small rolling mill.we have half-automatic/fully automatic steel bar production line machinery.we can also design machinery under customer's invest.so the more of your suggestion will be best for us.
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
![]() |
Industrial Hot Rolling Mill 10mm Continuous Automatic Steel Rebar Production Line Images |