Sign In | Join Free | My chinaqualitycrafts.com
China Xi'an Abundance Metallurgical Equipment Co., Ltd. logo
Xi'an Abundance Metallurgical Equipment Co., Ltd.
Professional industrial furnace manufacturer
Verified Supplier

1 Years

Home > Steel Smelting Equipment >

BOF Basic Oxygen Furnace Metallurgical Equipment Electric Arc Furnace 3T-50T

Xi'an Abundance Metallurgical Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

BOF Basic Oxygen Furnace Metallurgical Equipment Electric Arc Furnace 3T-50T

  • 1
  • 2
  • 3

Place of Origin : Shaanxi, China

Brand Name : AE

Price : Negotiation

Certification : CE;ISO9001;ISO14001;OHSAS 18001

MOQ : 1

Delivery Time : 30-90work days

Type : Arc Furnace

Use : Melting Furnace

Warranty of core components : 1 Year

Core Components : PLC

Warranty : 1 Year

Key Selling Points : Competitive Price

Contact Now

Basic Oxygen Furnace

Basic Oxygen Furnace Unleash the Full Potential of Your Metallurgical Equipment with Electric Arc Furnace 3T-50T

Top Blown Process (BOP)

In the top blown process a water cooled oxygen lance is lowered from the top of the furnace and blows oxygen at supersonic speed into the melt. The majority . steelmakers utilize top-blown oxygen steelmaking.

Bottom Blown Furnace (Q-BOP)

In the bottom-blown processes, oxygen is introduced through a number of tuyeres in the bottom of the furnace. In the Q-BOP process, the oxygen tuyeres are cooled by injecting hydrocarbon gas through an outer pipe surrounding the oxygen pipe. Most bottom-blown processes use methane or propane as the hydrocarbon coolant, but fuel oil is also used. A principle advantage of the Q-BOP process is that it reduces the height requirements of the process allowing a lower profile building to be constructed.Combination Processes

One class of combination blown process uses top-blown oxygen with inert gas (argon and Nitrogen) injection through the bottom by means of tuyeres or permeable elements. In the second class of combination furnaces, there are both top and bottom oxygen lances; the bottom lances can also be used for inert gas injection during stirring.
The basic oxygen furnace (BOF), whose profile is shown in the figure, is a tiltable vessel lined with refractories such as magnesia carbon brick. Auxiliary equipment includes a chute for scrap charging, hoppers for alloys and fluxes, a lance for injecting pure oxygen gas, a sublance for measuring the temperature and carbon concentration of the molten steel, lifting devices for the lance and sublance, equipment for tilting the vessel, and equipment for recovering and cleaning the exhaust gas. The BOF capacity is expressed as the weight of crude Steel that can be decarburized per heat. Most BOFs in Japan have a capacity of 150-300 tons.

The main function of the BOF is to decarburize the hot metal using pure oxygen gas. In the top-blown BOF, pure oxygen is injected as a high-velocity jet against the surface of the hot metal, allowing penetration of the impinging jet to some depth into the metal bath. Under these conditions, the oxygen reacts directly with carbon in the hot metal to produce carbon monoxide. The pure oxygen top-blown BOF can decarburize 200 tons of hot metal from 4.3% C to 0.04% C in about 20 minutes. As a result of this high productivity, the BOF replaced the open hearth furnace, which was a much slower process.

The injected pure oxygen gas first oxidizes silicon and then carbon in hot metal. When the carbon concentration of the hot metal is decreased to about 1%, the oxidation of Iron begins in parallel with that of carbon. The oxidation of Iron becomes marked at carbon concentrations of less than 0.1%, decreasing both the oxygen efficiency for decarburization and the decarburization rate, while increasing Iron loss into the slag. The problem with the top-blown BOF is thus the oxidation of Iron when a low carbon concentration is reached, and the resulting decrease in the decarburization rate. When the Iron oxide content of the slag increases excessively, it can react too quickly with carbon in the molten Steel and cause sudden gas evolution, forming a mix of slag and molten Steel that sometimes erupts from the vessel in a phenomenon called "slopping" or "spitting".

The use of an oxygen lance with multiple holes at the tip has proven very effective in delocalizing the oxygen supply and increasing the decarburization rate while restraining excessive oxidation of the molten Steel and preventing slopping and spitting. However, the effectiveness of this lance was still inadequate, and the bottom-blown oxygen process was developed, in which pure oxygen gas is injected into the molten Steel from the bottom of the BOF. The bottom blowing enhances the stirring of the hot metal and thereby shortens the average mixing time in the molten Steel bath, and promotes transport of solute carbon in the bath, preventing the over-oxidation of slag, which is the cause of slopping and spitting. Consequently, the bottom blowing enhances decarburization efficiency, especially at low carbon concentrations. The bottom-blowing is performed with bottom tuyeres of concentric double-wall pipe. The inner pipe is used to blow pure oxygen gas along with pulverized limestone as a slag-forming agent, while propane gas is blown through the outer pipe as a coolant to prevent tuyere burn back, since propane undergoes an endothermic reaction during decomposition, which results in cooling and reduced burning of the tuyeres. These improvements have made the production of low-carbon steels much easier.

The top-and-bottom blown BOF, which combines the advantages of both types of BOF, has recently become prominent in oxygen Steel making The combined blowing BOFs mostly use bottom-blown inert gases in place of oxygen gas for stirring. Various methods of bottom-blowing have been adopted. As one example, a ceramic plug with embedded multiple small pipes or multiple slits is used in the bottom tuyeres. Irrespective of the type of the BOF, the exhaust gas, which is high in CO content, is either combusted in the throat of the BOF and passes through a waste-heat boiler installed in the upper part of the throat to recover the sensible heat and the heat of combustion, or is recovered un combusted through exhaust-gas recovery equipment

BOF Basic Oxygen Furnace Metallurgical Equipment Electric Arc Furnace 3T-50T

After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.


Product Tags:

3T Basic Oxygen Furnace

      

BOF Basic Oxygen Furnace

      

bof furnace Metallurgical Equipment

      
Quality BOF Basic Oxygen Furnace Metallurgical Equipment Electric Arc Furnace 3T-50T for sale

BOF Basic Oxygen Furnace Metallurgical Equipment Electric Arc Furnace 3T-50T Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xi'an Abundance Metallurgical Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)